Reduction of downtime loss by using reliability theory based preventive maintenance: a case study of the concrete industry

Main Article Content

Somsak Samrit
Athakorn Kengpol
Sompoap Talabgaew

Abstract

The purpose of this research was to reduce downtime loss because of immediate machine breakdown in the process. This problem is caused from an inappropriate preventive maintenance plan. The research methodology applies reliability engineering theory for analyzing the replacement period which can improve the preventive maintenance plan. According to the result, a preventive maintenance plan based on the reliability theory results in downtime loss because of breakdown in concrete mixer machines reduced from 865.33 minutes / month to 301.67 minutes / month and the availability rate can be increased from 88.48 percent to 95.82 percent. 

Article Details

How to Cite
Samrit, S., Kengpol, A., & Talabgaew, S. (2017). Reduction of downtime loss by using reliability theory based preventive maintenance: a case study of the concrete industry. Asia-Pacific Journal of Science and Technology, 16(2), 145–158. Retrieved from https://so01.tci-thaijo.org/index.php/APST/article/view/83199
Section
Research Articles